Replacement of Multiple HVAC Units (B848A)

BVM replaced 6-ton and 7.5-ton existing air handlers in B848A at NAS Jacksonville, FL which served flight simulators. Project included coordination with the customer to work around training schedules and maintaining a tight construction schedule to minimize the impact on the customer.

NOTU Cape Canaveral – Chiller & Air Handler Replacement

BVM replaced two 60-ton air-cooled chillers and the outdoor air handler at NOTU, Cape Canaveral. The scope included removal of the existing units, installation of two Trane CGAM 60-ton chillers, replacement of isolation valves, thermometers, and pressure gauges, new electrical circuits, and installation of a Trane chilled water Climate Changer air handler with updated controls.

Wellness Center (B867) – AC & Air Handler Replacement

This project included replacement of a 10-ton air conditioning unit and air handler. BVM provided and installed a new 208/230V, 3-phase, 10-ton straight cool condenser and matching air handler. The project also involved acoustical ceiling work, new ductwork and piping, electrical connections, dampers, thermostats, and a standalone DDC user interface.

Liberty Center (B816) – AC Unit Replacement

This project included the installation of a new 7.5-ton heat pump air handler and condensing unit, along with new ductwork, electrical connections, controls, and acoustical ceiling modifications to support the upgraded system.

Youth Center Gym – Complete AC Unit Replacement

BVM replaced five 5-ton AC systems and removed a make-up air system at this Youth Center Gym located on NAS Jacksonville. The new setup included four wall-mounted, self-contained 5-ton heat pump units, a 208/230V 3-phase DX heat pump air handler, and a matching R-410A condensing unit. Project scope also included new ductwork, electrical connections, and […]