BVM replaced five 5-ton AC systems and removed a make-up air system at this Youth Center Gym located on NAS Jacksonville. The new setup included four wall-mounted, self-contained 5-ton heat pump units, a 208/230V 3-phase DX heat pump air handler, and a matching R-410A condensing unit. Project scope also included new ductwork, electrical connections, and controls.